BTG has two test facilities available in laboratory in Enschede, the Netherlands. The facilities are used for screening feedstocks, process development and optimisation, producing oil samples, and generating engineering data for full scale plants.

Production Plant

BTG realised a first pyrolysis-oil production plant in Malaysia with the design capacity 2 t of dry biomass per hour. The plant processes Empty Fruit Bunches (EFB) from close palm mill, which were originally incinerated without recovering of the heat. The heat required for drying of the EFB (65 wt% moisture) is taken from the pyrolysis plant.
The detailed design of its modular construction and construction of pyrolysis unit took place in the Netherlands in 2004, the unit was shipped to Malaysia in 2005.

The main achievements are:

More information on our test facilities can be found on web pages of BTG Biomass Technology Group.

Back